Multiple Choice
Demand calculations for generator set(s) sizing shall be based on the following: (1) prudent demand factors and historical data, (2) ____, (3) Article 220 feeder calculation procedures, or (4) any combination of the preceding.
A) average load
B) peak load
C) connected load
D) cable (material) capacity
Correct Answer:

Verified
Correct Answer:
Verified