True/False
Mike, a plumbing contractor, was hired to correct a stoppage in the sewer line at Sarah's house. During his work, he discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. To meet public regulations, the water pipe had to be replaced either then or later, when the yard would have to be redug. Mike replaced the water pipe and Sarah inspected the work daily and did not object to the extra work. When Mike finished, Sarah refused to pay for the water pipe replacement since that was not what she originally hired Mike to do and she had never specifically agreed to that work. Sarah must pay Mike for his labor and materials costs for both the sewer and water line repair.
Correct Answer:

Verified
Correct Answer:
Verified
Q59: What is the doctrine of promissory estoppel,
Q60: Alice makes a material misrepresentation of fact
Q61: Contracts that are implied in law:<br>A) are
Q62: Lance has a contract with Smith to
Q63: Stan sends for a law school catalog
Q65: General contract law governs all contracts outside
Q66: Express contracts and implied in fact contracts:<br>A)
Q67: A contract to sell life insurance is
Q68: According to the UCC, an enforceable agreement
Q69: An implied in fact contract is formed