Multiple Choice
Where a central tower crane is not in place on a site, using ______ to place concrete is usually the most economical alternative.
A) a hand-operated buggie
B) a conveyor
C) a powered buggie
D) pumps
Correct Answer:

Verified
Correct Answer:
Verified