Multiple Choice
When working on the high-voltage system, which of the following should be done?
A) Always place the high-voltage service plug where someone will not accidentally reinstall it.
B) Before servicing, use a voltmeter set on 400 VDC to determine if the high-voltage system voltage is at 0 volts.
C) Test the integrity of the insulating gloves prior to use.
D) All of these choices.
Correct Answer:

Verified
Correct Answer:
Verified
Q1: The main advantage of the ISG system
Q2: All of the following statements concerning hybrid
Q5: All of the following are benefits of
Q6: The splitting of water into hydrogen and
Q8: To test the integrity of the insulating
Q9: The dual-voltage system can use:<br>A) A dual-generator
Q31: Electric vehicles power the motor by:<br>A) A
Q33: The high-voltage service plug:<br>A) Disconnects the inverter/converter
Q42: In a hybrid system, the _ _