Multiple Choice
The filler passes should be stopped when the surface is approximately ____________ below the pipe's outer surface.
A) 1/32 in. to 3/32 in. (0.8 mm to 2.4 mm)
B) 1/16 in. to 1/8 in. (1.6 mm to 3 mm)
C) 1/32 in. to 3/32 in. (0.8 mm to 2.4 mm) .
D) 3/64 in. to 1/8 in. (1.2 mm to 3 mm)
Correct Answer:

Verified
Correct Answer:
Verified