    In Preparing the Pipe for Welding, the Pipe Should Be
Solved

In Preparing the Pipe for Welding, the Pipe Should Be

Question 33

Question 33

Multiple Choice

In preparing the pipe for welding, the pipe should be tack welded together with a root opening of ____ inch.


A) 1/16 to 1/8
B) 1/16 to 1/4
C) 3/32 to 1/8
D) 1/8 to 1/4

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Q28: Which of the following is a cause

Q29: _ result(s) from excessive heat, temperature, and

Q30: Most codes and standards for GTA pipe

Q31: What is the weld pass that can

Q32: Which of the following is a measure

Q34: The amount of concavity in a root

Q35: _ can be used to back any

Q36: The end of the pipe is prepared

Q37: Incomplete fusion can be detected by _.<br>A)

Q38: The _ is the distance between the

Examlex

ExamLex

About UsContact UsPerks CenterHomeschoolingTest Prep

Work With Us

Campus RepresentativeInfluencers

Links

FaqPricingChrome Extension

Download The App

Get App StoreGet Google Play

Policies

Privacy PolicyTerms of ServiceHonor CodeCommunity Guidelines

Scan To Download

qr-code

Copyright © (2025) ExamLex LLC.

Privacy PolicyTerms Of ServiceHonor CodeCommunity Guidelines