As a typical example of a bar mark number assigned to a reinforcing bar shown on poured-in-place concrete drawings, 4A1 indicates ____.
A) a quantity of 4, bar type A, and length 1, where 1 is matched to the general legend for the drawings
B) a number 4 bar, type A, and quantity of 1 for this bar needed in the job
C) a number 4 bar, type A, and it is the first length of bar used in the job
D) the code for a particular bar type that is specified in the general legend for the drawings
Correct Answer:

Verified
Correct Answer:
Verified
Q30: The first drawing in a set of
Q31: _ prepare engineering drawings of column layouts
Q32: A commonly used floor system in poured-in-place
Q33: Prepared from engineering drawings and sketches and
Q34: Poured-in-place concrete differs from _ that is
Q35: The absence of beams and girders and
Q36: In what types of applications are cantilever
Q38: A commonly used floor system in poured-in-place
Q39: In a slab designation 3S4, the number
Q40: Commonly used as exterior walls of a