Question 1
Multiple Choice
To start drawing a second floor, you should create the needed layers and then _____ the main floor information.
Question 2
Multiple Choice
A wall 16'-2'' will require ____ sheets of OSB, with 3'-10'' left over.
Question 3
Multiple Choice
Cabinets should be drawn using which two commands?
Question 4
True/False
Even if you are drawing plans for a construction site where seismic risk is high, you can alter window placement depending on whether an engineer supervises the design or the design follows the prescriptive path of the IRC.