Multiple Choice
A small company makes three different types of bird houses. Each type requires the services of three different departments, as indicated by the following table. Type A Type B Type C Cutting department 0.2 hour 0.1 hour 0.3 hour Finishing department 0.5 hour 0.5 hour 0.4 hour Assembly department 0.1 hour 0.1 hour 0.3 hour The cutting, finishing, and assembly departments have available a maximum of 61, 128, and 52 work-hours per week, respectively. How many bird houses of each type should be made per week so that the company is operating at full capacity?
A) 70 houses of type A, 60 houses of type B, and 100 houses of type C
B) 90 houses of type A, 70 houses of type B, and 120 houses of type C
C) 80 houses of type A, 60 houses of type B, and 100 houses of type C
D) 90 houses of type A, 60 houses of type B, and 110 houses of type C
Correct Answer:

Verified
Correct Answer:
Verified
Q7: A matrix of dimension <span
Q8: Solve the system by the substitution
Q9: Solve the system. <span class="ql-formula"
Q10: Solve the problem by using a system
Q11: Give a step-by-step explanation of how
Q13: The elimination-by-addition method can be used to
Q14: The solution set is infinitely many ordered
Q15: Graph the system so that approximate
Q16: Use a matrix approach to solve
Q17: Use a matrix approach to solve