Multiple Choice
The following assumption can be made that significantly impact the calculated corrosion rate early in the equipment life
A) If the base line thickness were not performed the nominal thickness may be used for the original thickness
B) If original thickness not available, averaged at thickness readings may be used
C) If the original thickness not available, maximum at thickness readings may be used
Correct Answer:

Verified
Correct Answer:
Verified
Q16: Most of the damage from thermal effects
Q17: _ to be established to judge acceptability
Q18: The programme that focused on maintaining the
Q19: RBI is focused on a systematic determination
Q20: A process to assess risks, to determine
Q22: Hazard identification in a RBI analysis generally
Q23: Potential source of errors in RBI analysis
Q24: The risk assessment programme which focuses on
Q25: A RBI analysis shares many of the
Q26: The type of failure mode that likely