Multiple Choice
Potential hazards identified in a PHA will often affect the
A) Probability of failure side of the risk equation.
B) Consequence of failure side of the equation
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q42: Probability side of the risk equation is
Q43: Through _, inspection activities are focused on
Q44: Following will cover the functional failures except<br>A)
Q45: Consequence is always _ for safety aspects<br>A)
Q46: _curves are referred for the deterioration mechanism
Q48: _ depict ways in which the system
Q49: The suitability and current condition of the
Q50: Act of mitigating a known risk to
Q51: RBI may include methodologies to assess the
Q52: Results of quantitative consequence analysis are usually