Multiple Choice
A business analyst (BA) is working on a project to provide a temporary solution that will last for two months. The BA is feeling overwhelmed with the work needed to create the huge number of links to provide full traceability from solution requirements to design for this solution. How can the BA justify omitting all possible links?
A) Such traceability is at a lower level of abstraction for this project
B) The value each link is delivering in this situation is not high
C) Traceability is a low priority as the BA has other work to complete
D) It is impossible for anyone to confirm if such links are correct
Correct Answer:

Verified
Correct Answer:
Verified
Q100: Which one of the following statements best
Q101: After a walk-through of the requirements specification
Q102: Which one of the following business analysis
Q103: What's the difference between a desired outcome
Q104: According to the business analysis book 'A
Q106: A business analyst is studying the cost
Q107: As a business analyst, it's important to
Q108: Which of the following are documented approaches
Q109: A business analyst (BA) has been spending
Q110: You are the business analyst for your