A business analyst (BA) is working on a project to provide a temporary solution that will last for two months. The BA is feeling overwhelmed with the work needed to create the huge number of links to provide full traceability from solution requirements to design for this solution. How can the BA justify omitting all possible links?


A) Such traceability is at a lower level of abstraction for this project
B) The value each link is delivering in this situation is not high
C) Traceability is a low priority as the BA has other work to complete
D) It is impossible for anyone to confirm if such links are correct