Multiple Choice
You have just started a relayout job on a large volume, and your work is interrupted by an unrelated server outage. Site policy requires that the relayout should be completed or rolled back within its scheduled window. You want to stop the relayout and roll back the incomplete changes so that the VxVM configuration is left stable till the relayout can be rescheduled. What would you do to perform this task?
A) You cannot undo a relayout operation until it completes.
B) You can reverse the volume to its original layout by using "vxrelayout reverse"
C) You can stop the process running the vxrelayout task; VxVM will automatically clean up after the relayout.
D) You can stop the relayout job with vxtask abort, and then reverse the volume to its original layout by using vxrelayout.
Correct Answer:

Verified
Correct Answer:
Verified
Q357: What is the second stage of an
Q358: What are the four principal policy checkpoints
Q359: In which two (2) locations should an
Q360: What tool, installed by default on the
Q361: You need to provide storage space for
Q363: You need to create a traditional third-mirror
Q364: You are auditing a current storage environment
Q365: An administrator needs to remove an agent
Q366: Which sandbox technology is available for Email
Q367: When you attempt to start the RAID-5