Multiple Choice
An installation engineer is installing the power connections to the ACP 4200. What must the installation engineer be aware of?
A) Before connecting the power, the power switches of all components in the rack must be in the OFF position.
B) Power cables must only access the rack from the top of the rack.
C) Power connections must be within 10 feet (3 meters) of the rack.
D) Power cables must only access the rack from the bottom of the rack.
Correct Answer:

Verified
Correct Answer:
Verified
Q34: Refer to the exhibit. <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1131/.jpg" alt="Refer
Q35: Which three tasks must be performed by
Q36: What are two examples of Avaya Orchestrator
Q37: What is the purpose of VMware vMotion
Q38: Using VMware networking in ACP 4200, how
Q40: Refer to the exhibit. <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1131/.jpg" alt="Refer
Q41: An Avaya Orchestrator administrator is asked to
Q42: When a new instance and new VMs
Q43: The customer's networking team is considering connectivity
Q44: Refer to the exhibit. <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1131/.jpg" alt="Refer