Multiple Choice
What is the first step in upgrading the VSP switches in an Avaya ACP 4200?
A) Verify redundancy is active.
B) Power down secondary device.
C) Verify connectivity to NTP server.
D) Disable Telnet access.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q22: A support engineer has completed the upgrade
Q23: A support engineer is upgrading a PodFX
Q24: Which command will verify VSP adjacencies?<br>A) set
Q25: A support engineer is tasked with upgrading
Q26: You notice that Orchestrator is unable to
Q28: An ESXi Host server has been replaced
Q29: What would a support engineer expect to
Q30: A support engineer logs into the System
Q31: Which feature in Avaya Orchestrator allows a
Q32: A support engineer is tasked with working