Solved

A Company with a DR Site Connected with a 2

Question 75

Multiple Choice

A company with a DR site connected with a 2 Gbps FC link has three RPAs at each site. They are experiencing High Load events, although the FC link is not fully utilized. What would be the best solution to get the FC link utilization up as high as possible while mitigating those events?


A) Use a Distributed Consistency Group
B) Add one RPA to the Primary site
C) Use the Consistency Group on both RPAs and add two RPAs to the secondary site
D) Add one RPA to the DR site