Multiple Choice
When designing an EMC RecoverPoint environment, what must be taken into account when a site consists of multiple VMAX splitters or multiple RecoverPoint clusters?
A) A total of 16 gatekeepers are required for each VMAX splitter/RecoverPoint cluster combination.
B) All gatekeepers must be connected to each VMAX splitter/RecoverPoint cluster combination with fixed paths.
C) A total of eight gatekeepers are required for each VMAX splitter/RecoverPoint cluster combination.
D) When the VMAX splitter/RecoverPoint cluster is connected through Fibre Channel only two gatekeepers must be used.
Correct Answer:

Verified
Correct Answer:
Verified
Q60: A Storage administrator would like to increase
Q61: A company with multiple remote offices has
Q62: When the LUN Snapshot Restore operation is
Q63: Which Open Replicator mode is used by
Q64: What is the correct method to initiate
Q66: Which Dell EMC UnityXT system user interface
Q67: On a Dell EMC Unity XT file
Q68: Which operation can be performed from the
Q69: Which Dell EMC Unity XT model(s) supports
Q70: A Windows test server ran a stress