Multiple Choice
Which three troubleshooting procedures do you perform when there is no power to a Cisco UCS B250 M2 Blade Server? (Choose three.)
A) Decommission and acknowledge the blade.
B) Check the back of the blade to ensure that there is no damage to the connection that goes into chassis.
C) Reseat the memory DIMMs.
D) Check the CPU sockets for bent pins.
E) Reseat the blade in the same slot in the chassis.
F) Move the blade to another slot in the chassis.
Correct Answer:

Verified
Correct Answer:
Verified
Q8: Which tool is needed when servicing a
Q9: In the Cisco UCS S3260 Storage Server
Q10: Which two types of information does the
Q11: How many 10GBASE-T port licenses are preinstalled
Q12: Which two cable types can support 10Gbps
Q14: Which type of optics module is supported
Q15: Which type of optics module is supported
Q16: Refer to the exhibit. <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1178/.jpg" alt="Refer
Q17: Which two statements are true about the
Q18: What is the command to provide details