Multiple Choice
An engineer changed the TCP Power Threshold for a wireless deployment from the default value to -65 dBm. The engineer conducts a new post deployment survey to validate the results. What is the expected outcome?
A) decreased channel overlap
B) increased cell size
C) increased received sensitivity
D) decreased client signal strength
Correct Answer:

Verified
Correct Answer:
Verified
Q42: The wireless team must configure a new
Q43: An engineer is conducting a Layer 2
Q44: Multiple WLCs are implemented in a high-availability
Q45: An engineer is reducing the subnet size
Q46: An enterprise is using the wireless network
Q48: Which Cisco IOS VPN technology leverages Ipsec,
Q49: What is the recommended cell overlap when
Q50: A network engineer is working on a
Q51: Which two statements indicate a valid association
Q52: As part of a wireless site survey