Multiple Choice
Refer to the exhibit. Partial configuration from N9K-1 and N9K-2 is included. The client has two WANs connected. WAN-1 is for normal business-day activities. WAN-2 is for server backups during nonworking hours of 1:00 a.m. to 5:00 a.m. daily. The client says that at the scheduled time for backup, the data center server failed to use the WAN-2 link to back up the servers to the cloud backup system. What is the solution to this problem?
A) The event timer must be written in epoch time format.
B) The Cisco Nexus switch must be configured with one applet because a configuration with two applets will fail.
C) The Cron entry must be configured without double quotes.
D) The applet called "Backup" must include an action to remove the current static route.
Correct Answer:

Verified
Correct Answer:
Verified
Q15: An attempt to use a global vNIC
Q16: <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1178/.jpg" alt=" Refer to the
Q17: <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1178/.jpg" alt=" Refer to the
Q18: <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1178/.jpg" alt=" Refer to the
Q19: <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1178/.jpg" alt=" Refer to the
Q21: An engineer implements a storage VDC, but
Q22: A client reports that many flaps and
Q23: A server fails to boot from the
Q24: <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1178/.jpg" alt=" Refer to the
Q25: An engineer troubleshoots a failed DCBX exchange