Multiple Choice
An administrator needs to create and start five new VMs for a Data Analytics Project (OLAP) . The VM Profile is as follows: vCPU:4 vRAM: 64 GB vDisk: 1.5 TB Each of the four nodes of the Nutanix cluster has the following: 24 vCPU. 20% overall usage 192 GB RAM, 60% overall usage 2 x l920 GB SSD 4 x 2 TB HDD At cluster level, there is a single RF2 container that is 30% utilized and has an extent store capacity of 13.5 TB. Which component requires administrator attention?
A) Physical RAM, because it is not enough to power on all of the new VMs.
B) Physical Cores, because they are not enough to power on all of the new VMs.
C) Storage, because the capacity is not enough to create VMs.
D) Flash Tier because it is not enough to accommodate the workloads.
Correct Answer:

Verified
Correct Answer:
Verified
Q1: An administrator needs to initiate a new
Q3: An administrator wants to utilize Network Visualization
Q4: Refer to the exhibits. An administrator has
Q5: An administrator receives an error indicating that
Q6: An administrator needs to replace the self-signed
Q7: An alert about RX errors on eth2
Q8: A new Nutanix cluster is ready for
Q9: In a Nutanix cluster, a Protection Domain
Q10: An administrator needs to replace an aging
Q11: An administrator receives an alert in Prism