Multiple Choice
An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned. How should the administrator perform this task?
A) Check the Disregard Existing Workloads radio button in the Runway scenario.
B) Check the Disregard Existing Nodes radio button in the Runway scenario.
C) Add up the recovered workloads and manually remove from the Runway configuration.
D) Power down the workloads during a maintenance window and run the Capacity Runway.
Correct Answer:

Verified
Correct Answer:
Verified
Q20: An administrator is migrating 5MB shares from
Q21: An administrator needs to migrate workloads from
Q22: An administrator has two clusters: Site A
Q23: An administrator needs to relocate an AHV
Q24: A customer has two mission-critical applications and
Q26: An administrator deploys Exchange on a Nutanix
Q27: A company needs to replicate their VMs
Q28: A customer with a four-node RF2 cluster
Q29: A guest VM is reported to have
Q30: A Nutanix cluster is deployed with the