Multiple Choice
An architect is planning an HPE Moonshot System to host a customer Hadoop MapReduce2 application. The architect originally proposed the following: m710 cartridges HPE 45XGc switches HPE 4-QSFP+ Uplink Modules The customer now needs each HPE Moonshot chassis to provide at least 1TB of memory and 40TB or local storage. Cartridge nodes needs two 10GbE ports each. What does the architect need to replace in the solution to meet the customer's new requirements?
A) m710 cartridges with m350 Cartridge, which provide more memory
B) m710 cartridges with m710p cartridges, which support higher capacity local drives
C) 45XGc switches with 180G switches, which provide the required two 10GbE ports to the cartridges
D) 4-QSFP+ Uplink Modules with 16-SFP+ Uplink Modules, which provide 10GbE ports to the cartridges
Correct Answer:

Verified
Correct Answer:
Verified
Q56: A customer is using HPE OneView to
Q57: A customer is planning a multi-threaded HPC
Q58: An architect finds several vulnerabilities with a
Q59: A customer requests a proposal for an
Q60: A customer needs a live transcoding solution
Q62: An architect is choosing between 1GbE and
Q63: A customer needs to integrate an existing
Q64: An architect takes the following notes during
Q65: What is one advantage of hard partitioning,
Q66: A customer plans a partial migration from