Multiple Choice
An architect is presenting a file-based transcoding solution to a customer. The solution will include a single HPE Moonshot 1500 chassis that will be directly connected to HPE Apollo 4530 storage via 4 x QSFP uplinks. The customer is concerned about the significant traffic that will generated between the HPE Moonshot 1500 chassis and the HPE Apollo 4530 storage. Which factor should the architect design into the solution to address the customer's concerns?
A) Setup the solution so the cartridges use both adapters
B) Add two HPN 5930 ToR switches with IRF
C) Add uplinks as the workload increases
D) Install cartridges that have GPUs
Correct Answer:

Verified
Correct Answer:
Verified
Q48: A customer plans to purchase some c7000
Q49: An architect needs to scope the number
Q50: An architect has selected the FlexibleLOM option
Q51: A customer needs an HPE Apollo 6000
Q52: An architect is positioning a scale-up solution
Q54: An architect is planning an HPE Apollo
Q55: An architect is planning an HPE Moonshot
Q56: A customer is using HPE OneView to
Q57: A customer is planning a multi-threaded HPC
Q58: An architect finds several vulnerabilities with a