A proposed solution includes the HPE Moonshot-4QSFP+ Uplink Modules. The customer informs the architect that the planned purchase of 40GbE switches has been postponed. The customer still intends to purchase 40GbE switches within a year, but in the meantime, existing 10GbE switches will be used. These switches are HPE network switches located 25 meters from the location of the racks that house the HPE Moonshot Solution. The customer needs 30Gb/s bandwidth. Which action should the architect recommend to allow the customer to deploy the solution immediately and easily take advantage of 40GbE when deployed later?
A) Swap in HPE Moonshot-16SFP+ Uplink Modules
B) Replace the QSFP+ transceivers with SFP+ transceivers
C) Add QSP+/SFP+ adaptor kits to the design
D) Replace the DAC cables with DAC splitter cables
Correct Answer:

Verified
Correct Answer:
Verified
Q20: An architect is proposing a solution that
Q21: HPE Moonshot 180G Switch Modules and HPE
Q22: A customer recently purchased an HPE Moonshot
Q23: An architect is planning an HPE Integrity
Q24: A customer is considering upgrading from a
Q26: A customer has an HPE c7000 chassis
Q27: Which statement describes the availability metrics for
Q28: An architect is designing an HPE Apollo
Q29: A customer needs a mission critical SQL
Q30: A customer needs high performance computing (HPC)