Multiple Choice
Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40Gb F8 modules. The customer wants to: add a second frame before they move into production have unified management have a separate logical enclosure for each frame What are the basic steps to add the second frame? (Choose three.)
A) Move the standby composer to the second frame.
B) Disconnect the existing management ring, and then cable the FLM (frame link module) in the first frame to the FLMs in the second frame.
C) Install a satellite module in the first frame.
D) Move the bottom VC module from the first frame to the second.
E) Move one of the uplinks from the FLM in the first frame to a FLM in the second.
Correct Answer:

Verified
Correct Answer:
Verified
Q28: You are introducing Synergy to a new
Q29: A customer exceeded the number of available
Q30: A customer needs to track contract and
Q31: A customer has 10 HPE BladeSystem enclosures
Q32: A customer wants a highly available storage
Q34: Which iLO 5 feature allows a customer
Q35: A customer wants to streamline firmware and
Q36: You need to demonstrate the runtime firmware
Q37: What must a customer consider when adding
Q38: A customer is designing an infrastructure and