Multiple Choice
A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPE Synergy platform. Which steps must the integrator perform in the configuration to meet the customer's needs?
A) Connect Satellite modules using Ports L1 and L4
B) Connect Ports Q7 and Q8 on the Master interconnect Modules (ICM)
C) Install Redundant Frame Link Modules and a second management ring
D) Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules
Correct Answer:

Verified
Correct Answer:
Verified
Q3: A customer has a containerized environment that
Q4: A customer needs to significantly improve I/O
Q5: A customer has a virtualized data center
Q6: An integrator is performing initial configuration of
Q7: A customer needs to deploy additional management
Q9: A customer has a VMware vSphere environment
Q10: Is this a use case for a
Q11: An integrator prepares deployment documents with the
Q12: A customer has a Microsoft Hyper-V virtualized