Multiple Choice
A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network. Which procedure should the integrator use to address the customer's concern?
A) Connect the RJ-45 front ports of each frame to an external switch. Then, connect the uplink from the external switch into the customer's management network.
B) Connect FLMs from all frames to two external switches for redundancy. Then, connect the two uplinks from the two switches into the customer's management network.
C) Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then, connect the uplink from the two switches into the customer's management network.
D) Connect FLMs from all frames into a management ring. Then, connect the management ring to the customer's management network using two uplinks.
Correct Answer:

Verified
Correct Answer:
Verified
Q106: <img src="https://d2lvgg3v3hfg70.cloudfront.net/C1454/.jpg" alt=" A customer connected
Q107: Using a two-port FLM, what is the
Q108: What must an integrator do before an
Q109: How many redundant fabrics are supported in
Q110: A customer needs to deploy a farm
Q112: Which policy can an integrator apply when
Q113: Is this a typical use case for
Q114: You are proposing HPE Synergy to support
Q115: Is this how the Composable Fabric handles
Q116: Is this a way that a software-defined