A customer has received a second frame for their HPE Synergy environment. The customer has added the second frame to the rack and correctly cabled the power and management ring. Based on the design shown, which changes need to be made to the configuration to ensure high availability? (Choose two.)
A) Split the management uplinks across both frames
B) Configure high availability in vCenter for the HPE OneView appliance
C) Configure high availability on the Frame Link Modules
D) Enable high availability in the Settings of the Composer
E) Move one of the Composers to the second frame
Correct Answer:

Verified
Correct Answer:
Verified
Q21: You need to migrate a customer's Hyper-V-based
Q22: Is this a use case for HPE
Q23: Using SSMC, an integrator has added a
Q24: Is this how the Composable Fabric handles
Q25: A customer is virtualizing some of their
Q27: Is this an essential component to include
Q28: A customer tries to revert a data
Q29: A customer needs to expand a single-frame
Q30: Is this a correct use case for
Q31: A customer has an HPE SimpliVity Federation