Multiple Choice
A systems administrator needs to add a VLAN to a network set to support a new application. They have added the network to the upstream switch and the Logical Interconnect Group in HPE OneView but traffic is not passing. What is the most likely cause of the problem?
A) Intelligent Management Center (IMC) has not been updated via REST
B) The upstream switch doesn't have the VLAN enabled
C) The administrator needs to update the Logical Interconnects from the Logical Interconnect Group
D) The administrator failed to update the state change message bus
Correct Answer:

Verified
Correct Answer:
Verified
Q1: Which condition will prevent HPE OneView from
Q2: Which behavior is the result of Device
Q3: A customer has an environment including HPE
Q4: An administrator is configuring a server profile
Q6: A customer has a large environment with
Q7: A server administrator wants to prevent excessive
Q8: What is the connection between BIOS and
Q9: Which parameter does the server profile assign
Q10: Which HPE product would you recommend to
Q11: Which actions can be taken on alerts