Multiple Choice
An organization is setting up a backup and restore system in AWS of their in premise system. The organization needs High Availability(HA) and Disaster Recovery(DR) but is okay to have a longer recovery time to save costs. Which of the below mentioned setup options helps achieve the objective of cost saving as well as DR in the most effective way?
A) Setup pre-configured servers and create AMIs. Use EIP and Route 53 to quickly switch over to AWS from in premise.
B) Setup the backup data on S3 and transfer data to S3 regularly using the storage gateway.
C) Setup a small instance with AutoScaling; in case of DR start diverting all the load to AWS from on premise.
D) Replicate on premise DB to EC2 at regular intervals and setup a scenario similar to the pilot light.
Correct Answer:

Verified
Correct Answer:
Verified
Q74: If a single condition within an IAM
Q75: A company plans to migrate to AWS.
Q76: Dave is the main administrator in Example
Q77: A company is operating a large customer
Q78: A utility company wants to collect usage
Q80: How many g2.2xlarge on-demand instances can a
Q81: Identify a benefit of using Auto Scaling
Q82: After your Lambda function has been running
Q83: A Solutions Architect is designing a highly
Q84: A company that develops consumer electronics with