Multiple Choice
A banking business running background storage system requirements are as follows: (1) Business Impact. The business impact generated by the operating system is about 100KB. (2) The service operation system is the whole GE network. The server and operating system are GE network. Follow-up to consider the business needs to upgrade to 10GE. (3) Only requires 72TB of total space, the latter expansion priority to expand the disk (4) Only 20U of rack space is reserved for the current storage devices. The configuration of three nodes and switches is prioritized to meet the requirements of the machine room. Cabinet planning based on the above requirements. What are the more appropriate networking solutions?
A) Program One: 1 * OceanStor 9000 C Node 36 * 2TB SATA configuration 2 * Front-end GE + 2 * Rear-end 10GE
B) Scenario 2: 3 * Oceanstor 9000 C Node 36 * 2TB SATA hard drive; 2 * Front-end GE + back-end 2 * 10GE
C) program three: 3 * OceanStor 9000 P Node 36 * 2TB SAS configuration
D) Program Four: 3 * OceanStor 9000 M Node
Correct Answer:

Verified
Correct Answer:
Verified
Q417: Customers using 5 ESXI 5.5 hosts and
Q418: In preparation for disaster recovery design, which
Q419: Redhat Linux Enterprise 6 cp command is
Q420: Which of the following VMWARE virtual machine
Q421: Which description of N8000 Clustered NAS file
Q423: Maintenance personnel discovered a storage fault indicator
Q424: Which of the following feature is correct
Q425: In the OceanStor VIS6600T dual-redundant switch network
Q426: Oracle database normally starts the opening state
Q427: In a Huawei disaster preparedness plan using