Multiple Choice
In the OceanStor VIS6600T dual-redundant switch network environment, using OceanStor Toolkit inspection found that "multi-path state detection "does not pass the inspection report. It is found that there are two routes in the 4 paths of the VIS6600T device's 0 node to each LUN of the array. The path status is disabled. According to the analysis, the switch port connected to port 0 of port A0 of node 0 on node 0 of the VIS6600T is visible on the optical switch. The received optical power is much lower than the rated power of the optical module. What actions should be taken to fix this?
A) Replacing the optical module of port 0 in slot A0 of node 0.
B) Replacing the light of the P0 port in the A0 slot of 0 node.
C) Replacing the optical module of the port connected to port 0 of the corresponding 0-node A0 slot on the switch.
D) Reseat the FC interface card corresponding to slot 0 of node A0.
Correct Answer:

Verified
Correct Answer:
Verified
Q360: Which of the following is correct regarding
Q361: A customer wants to deploy one OceanStor
Q362: In Huawei OceanStor 9000, which technologies are
Q363: Which of the following is not true
Q364: A computer center plans to purchase a
Q366: OceanStor V 3 storage SmartPatition can allocate
Q367: In an OceanStor V3 system storage array,
Q368: Using non-deduplication storage based on the disk
Q369: If you need to automate the DR
Q370: Some OceanStor V3 storage resources are mapped