Multiple Choice
A server technician is applying a security patch to an active-passive failover SQL cluster. However, the cluster must continue to service clients during the process with limited outages. Given this scenario, which of the following should the technician do to adhere to these maintenance requirements?
A) Failover back to the original active node once the patching is complete
B) Keep services failed over to passive node once patching is complete
C) Move services to the active node and repeat for the passive node
D) Patch the passive node, failover, and patch the other node
Correct Answer:

Verified
Correct Answer:
Verified
Q614: A server is connected to a switch,
Q615: A company is being audited by its
Q616: A technician is having problems sending a
Q617: An administrator needs to back up files
Q618: A SAN attached production file server is
Q620: Which of the following BEST describes RAID
Q621: A server technician is tasked to replace
Q622: A technician is tasked with creating servers
Q623: An administrator needs to securely dispose of
Q624: A server administrator wants to isolate a