Multiple Choice
A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the room and is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?
A) Continue plugging into the central UPS, but put the UPS on bypass to avoid load problems.
B) Plug the servers directly into the power that is not on the UPS.
C) Add stand alone UPSs for new servers not wired off the central UPS.
D) Continue plugging into the central UPS because the actual load supported is actually higher than stated.
Correct Answer:

Verified
Correct Answer:
Verified
Q620: Which of the following BEST describes RAID
Q621: A server technician is tasked to replace
Q622: A technician is tasked with creating servers
Q623: An administrator needs to securely dispose of
Q624: A server administrator wants to isolate a
Q626: A system administrator is given a server
Q627: An administrator wants to harden the security
Q628: Which of the following can limit cabling
Q629: A technician created a job on a
Q630: A technician correctly powers off and replaces