A technician is installing a new server with redundant power supplies in an ISO-certified datacenter. Which of the following should the technician perform?


A) Determine the maximum power load
B) Connect each power supply to separate power circuits
C) Connect each power supply to the UPS
D) Run a drop cord from an unused outlet and attach the power cords