Multiple Choice
At a production level of 5,280 units, a project has total costs of $150,000. The variable cost per unit is $23.12. Assume the firm can increase production by 750 units without increasing its fixed costs. What will the total costs be if 6,000 units are produced?
A) $122,780
B) $124,640
C) $138,720
D) $122,074
E) $166,646