True/False
A PieChart or a BarChart can be bound to an ObservableList; if the data inside the ObservableList change, we need to call a method of either PieChart or BarChart in order to redraw the chart.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q75: The FXML attribute we use to give
Q76: We do not have to use an
Q77: A GridPane organizes components in five potential
Q78: PieChart is a Node and thus can
Q79: The top-level structure in a JavaFX application
Q81: Which of the following statements is correct
Q82: A user can interact with a Label
Q83: What is the function of a GUI
Q84: When coding a GUI, it is possible
Q85: The Model-View-Controller architecture for writing GUI applications