Multiple Choice
Use the information below to answer the following questions.
Consider the following maximal flow problem where node 1 is the source and node 6 is the destination.
-Refer to the figure.What is the constraint associated with node 2?
A) X₁₂ - X₂₄ = 0
B) X₁₂ - X₃₂ - X₂₄ = 0
C) X₁₂ + X₃₂ - X₂₄ = 1
D) X₁₂ - X₃₂ + X₂₄ = 0
E) X₁₂ + X₃₂ - X₂₄ = 0
Correct Answer:

Verified
Correct Answer:
Verified
Q22: What is the constraint associated with
Q23: In a maximal flow problem,the flow capacity
Q24: Use the information below to answer the
Q25: An assignment model has three jobs and
Q26: Use the information below to answer the
Q28: The starting node of the shortest path
Q29: What is the constraint associated with
Q30: Use the information below to answer the
Q31: The objective function of an assignment problem
Q32: Use the information below to answer the