Multiple Choice
Site preparation costs include all of the following except
A) crane used to install equipment
B) freight charges
C) supplies
D) reinforcement of the building floor
Correct Answer:

Verified
Correct Answer:
Verified
Q47: Recurring costs include: hardware maintenance,software acquisition,software maintenance,insurance,supplies,and
Q48: When preparing a cost-benefit analysis,design costs incurred
Q49: Discuss the advantages and disadvantages of the
Q50: In a backbone system,the vendor designs the
Q51: When the nature of the project and
Q53: List three advantages and one disadvantage of
Q54: The systems analysis report does not<br>A)identify user
Q55: A tangible benefit can be measured and
Q56: When developing the conceptual design of a
Q57: Discuss the documentation requirements of systems designers