True/False
It is possible to minimize response time by running only interactive jobs and letting the batch jobs wait until the interactive load ceases.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q4: From HOLD, the job moves to WAITING
Q5: No movement between queues is a very
Q6: Each job is uniquely identified by the
Q7: Aging is used to ensure that jobs
Q12: Queues use _ to track jobs the
Q13: An I/O request is called a(n)_ wait
Q13: The _ is also called the high-level
Q21: Context switching is required by all preemptive
Q29: Shortest job next (SJN)is a nonpreemptive scheduling
Q36: _ allows for faster turnaround of CPU-bound