Multiple Choice
When controls are effectively designed, the auditor assesses control risk:
A) At a level that does not reflect the effectiveness of those controls.
B) at a level that reflects the effectiveness of those controls.
C) at a reduced level, as the controls are effective.
D) all of the above
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q39: The extent of tests of details of
Q40: In the context of an audit of
Q41: Which of the following assessments are affected
Q42: After performing a study and evaluation of
Q45: Which one of the following types of
Q46: Which one of the following steps is
Q47: Which of the following explains why many
Q49: In which stage(s)of an audit can analytical
Q77: Tests of controls are directed toward the
Q80: ASA 315 refers to the benefits and