Multiple Choice
Production overheads at Zurich Manufacturing total up to £600,000. There are three support departments for the business, quality control, maintenance and warehousing. Quality control's total overheads are £100,000 per annum. 60% of quality control's time is spent on assessing the quality of Zurich Manufacturing's own production. The other 40% of quality control's time is spent on assessing the quality of production at other small businesses in the local area. Maintenance overheads total up to £144,000 per annum. 75% of the maintenance department's time is spent on servicing production machinery, 20% on servicing warehousing's fork lift trucks and 5% on servicing equipment used by the administration department. 80% of warehousing space is allocated to storing raw materials and finished goods for Zurich Manufacturing with the other 20% being rented out to other local businesses in the area. Warehousing costs total up to £151,200 for the year. Production department employees' normal working hours are 40,000 each year. During the current financial year, actual hours worked were 48,000. What is the hourly overhead recovery rate (correct to two decimal places) that will be applied to products produced in the production department?
A) £19.00
B) £22.22
C) £22.80
D) £24.88
Correct Answer:

Verified
Correct Answer:
Verified
Q1: Only the direct costs of providing a
Q2: Knowledge of costs = control
Q3: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TBO1187/.jpg" alt=" What does line
Q4: Component ZVA sells for £200. This selling
Q6: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TBO1187/.jpg" alt=" What does line
Q7: Component TDQ sells for £325. This selling
Q8: Which of the following are assumptions of
Q9: The costs of an organization are the
Q10: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TBO1187/.jpg" alt=" What does line
Q11: Component QXP sells for £300. This selling