Indicate below whether the following items are for a post completion project summary (S) or a post-installation system review (R):
a. ____ review project objectives and project life cycle
b. ____ determine if the system is doing what it was intended to do
c. ____ identify areas of good and poor performance on the part of the project team
d. ____ review project expenditures and profitability
e. ____ check for system design flaws and needed changes
f. ____ where necessary, suggest changes to procedures that would improve performance in similar, future projects.
Correct Answer:

Verified
Correct Answer:
Verified
Q10: Statement: Phase D happens after the project
Q11: Statement: So that information is as current
Q12: Statement: It is the sole responsibility of
Q13: Statement: The contractor may be required to
Q14: Statement: A detailed plan for production is
Q16: What are the purposes of a post-completion
Q17: Statement: Prolonging the design stage to get
Q18: Statement: The majority of tests on a
Q19: Statement: The execution stage usually includes project
Q20: Statement: In the implementation stage, the user