Multiple Choice
Which of the following procedures would be the correct method of recalibrating fuel output from one pump element on a port-helix metering injection pump?
A) rotating the barrel
B) shimming the barrel flange
C) advancing port closure timing
D) increasing the charging pressure
Correct Answer:

Verified
Correct Answer:
Verified
Q35: What replaces the governor housing in an
Q36: Convert one bar to an approximate psi
Q37: Which of the following port-helix metering pump,
Q38: What is the reason for using helices
Q39: When the plunger metering recesses have minimum
Q41: Technician A says that only offshore engines
Q42: If there was a complete electrical failure
Q43: What event causes pressure collapse to occur
Q44: At what pressure is the fuel gallery
Q45: At what point during effective stroke does