Multiple Choice
Three machines, individually, can do a certain job in 2, 3 and 4 hours, respectively. What is the greatest part of the job that can be done in one hour by two of the machines working together at their respective rates?
A) 13/12
B) ¾
C) 5/6
D) 6/5
Correct Answer:

Verified
Correct Answer:
Verified
Q6: Find the value of log3 (9X27X81)<br>A)3<br>B)9<br>C)27<br>D)81
Q7: [(-3.0)(0.1)-(1.5)(0.2)]/5=<br>A)-1.2<br>B)-0.12<br>C)0<br>D)0)12
Q8: If diagonal of a square room is
Q9: (8)008)/(5.005) =<br>A)1)06<br>B)1)60<br>C)1)60016<br>D)1)601<br>E)1)6016
Q10: What is the maximum number of 2
Q12: If "basis points" are defined so that
Q13: What is the value of (0.2)5 ?<br>A)0)00032<br>B)0)0016<br>C)0)008<br>D)0)32
Q14: The average (arithmetic mean) of 4, 8,
Q15: If n is an integer and 0.0050505X10n
Q16: Find the smallest perfect square number which