Multiple Choice
In an NC machining operation, the tool has to be moved from point (5, 4) to point (7, 2) along a circular path with centre at (5, 2) . Before starting the operation, the tool is at (5, 4) . The G and N codes for this motion are
A) N010 GO3 X7.0 Y2.0 I5.0 J2.0
B) N010 GO2 X7.0 Y2.0 I5.0 J2.0
C) N010 GO1 X7.0 Y2.0 I5.0 J2.0
D) N010 GOO X7.0 Y2.0 I5.0 J2.0
Correct Answer:

Verified
Correct Answer:
Verified
Q38: Computer will perform the data processing functions
Q39: XY Plane Selection in CNC machining is
Q40: Rotation of spindle is designated by one
Q41: The process of copying data from a
Q42: Which machine's spindle is used to horizontal
Q44: Which of the following code will give
Q45: Secondary Linear Axes U,V & W are
Q46: Automatic tool change in CNC Machine code<br>A)M05<br>B)M06<br>C)M07<br>D)M09
Q47: The distance of a given tool tip
Q48: CAD/CAM is the relationship between<br>A)science and engineering<br>B)manufacturing