Multiple Choice
Commercial power generation from fusion reactor is not yet possible, because
A) it is difficult to initiate fusion reaction
B) the fuel required (e.g. deuterium and tritium) is scarce
C) it is difficult to control fusion reaction
D) quantity of fuel required for initiating fusion reaction is prohibitively high
Correct Answer:

Verified
Correct Answer:
Verified
Q14: Which reactor uses orthometaerhenyl and paratherphenyl as
Q15: What is acronym of LMFBR?<br>A)liquid molecular fast
Q16: In which reactor is the coolant in
Q17: Using Helium gas in GCFBR has many
Q18: What does the top of the pressurizer
Q19: How many percentage of fissionable U-235<br>A)0.1%<br>B)0.5%<br>C)0.7%<br>D)1.5%
Q20: Nuclear plant is located near the area
Q21: Which reactor consists of both fertile and
Q22: LWR stands for <br>A)lower water reactor<br>B)line water
Q24: Fast breeder reactors do not <br>A)use molten