Multiple Choice
The load factor is
A) always less than unity
B) less than or greater than 1
C) always greater than 1
D) less than zero
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q12: LLW stands for <br>A)low level water<br>B)low laser
Q13: What is the actual turbine inlet temperature
Q14: How are moderate active solid wastes disposed?<br>A)buried
Q15: How is High Level solidified nuclear wastes
Q16: Which type of boilers use orifice to
Q18: Load duration curve indicates <br>A)the variation of
Q19: Size and cost of installation depends upon<br>A)average
Q20: What is the unit of Heat rate?<br>A)kj/kw<br>B)kw/kj<br>C)kj<br>D)kw
Q21: What is Demand factor?<br>A)ratio of connected load
Q22: How are active liquids of nuclear waste