Multiple Choice
__________ in the production planning and control is checking of work and taking corrective steps to ensure that each piece of work is completed at the right time.
A) expediting.
B) dispatching.
C) routing.
D) scheduling.
Correct Answer:

Verified
Correct Answer:
Verified